Frequently asked questions about rooftop solar

Answers to the questions customers most often raise before installing rooftop solar. For anything not covered here, call or WhatsApp us on 99147 44011.

Question

Cost and savings

How much does rooftop solar cost?

Cost depends on system size, the panel and inverter brands, the height of the mounting structure, the cable run to the meter and whether battery storage is included. For this reason a firm written price is provided after the site survey.

How much will I save?

Savings depend on your tariff, the units you consume and when you consume them, and the area and shading of your roof. The proposal presents savings and payback as a range and states every assumption. We do not guarantee a single figure.

Is solar worth it if I already get 300 free units in Punjab?

For a household that stays within the free limit throughout the year, the savings are limited, and we advise accordingly. Where summer air conditioning takes consumption above the limit, a correctly sized system with net metering can bring it back within the limit. The home solar page explains how this works.

Can I get a loan for solar?

Yes. Public sector banks offer a PM Surya Ghar loan for home systems, and many banks and NBFCs lend for commercial solar. Interest rate, documentation and approval are determined by the lender. We provide the quotation and technical documents required.

Can a solar system run my ACs?

Yes, in the way that matters for your bill. An on-grid system does not power the AC on its own: during the day the panels supply the house first, so an AC running in the afternoon is largely running on your own solar power, and at night the units your panels exported are set against what you import. As a guide, a 3 kW system covers about one 1.5-ton inverter AC used through a Tricity summer, and two ACs need 5 to 6 kW. See solar for one or two ACs.

How much electricity will my system make?

In Tricity, each kW of shade-free, south-facing panels makes about 1,440 units a year, or roughly 110 to 125 units a month on average. Output follows the seasons: a 5 kW system can make about 450 units in January and 750 in May, and both are normal. See solar output month by month.

What happens to the extra units my panels make?

They go to the grid through the net meter and are set against the units you import. In Punjab, surplus units are carried forward from bill to bill within a settlement period that runs from October to September, and credit left at the end is paid at 75% of the feed-in tariff PSERC sets each year, which is well below what you pay for a unit. So a system is best sized to your own use, not larger. Chandigarh (CPDL) and Panchkula (UHBVN) follow their own rules. See how PSPCL bills export and import units.

Subsidy and paperwork

Can I get the PM Surya Ghar subsidy?

Households that own the property, hold a domestic connection in the applicant's name and have not previously received a solar subsidy are generally eligible. Commercial connections are not covered. We currently undertake subsidy projects in Mohali, Zirakpur, Kharar and New Chandigarh, and Chandigarh and Panchkula are coming soon. See the subsidy amounts and steps.

Is rooftop solar free under PM Surya Ghar Muft Bijli Yojana?

No. The scheme gives eligible homes a central subsidy towards the cost of the system, paid to the homeowner after it is installed and inspected. The free electricity in the name comes from the units your own panels make. See how much the subsidy is and how it works.

Do I need to increase my sanctioned load?

Only if the system your bills justify is larger than the load on your bill. In Punjab a net-metered system can be as large as your sanctioned load. For systems up to 10 kW, PSPCL raises the load as part of the solar application, and you pay the load-extension charges. See increasing your sanctioned load before solar.

Can I install solar on a rented house or a builder floor?

A tenant cannot claim the PM Surya Ghar subsidy, because the scheme is for a household that owns the house; the landlord can. Without the subsidy, a tenant needs the landlord's written consent to use the roof. In a builder floor, the sale deeds decide who owns the roof, and where it is shared every owner should agree in writing. See solar on a rented house or builder floor.

What is net metering?

Your electricity department replaces your meter with one that counts in both directions. Units your panels send to the grid are subtracted from units you take from it, and you are billed for the difference. It is what makes solar pay even when nobody is home during the day.

What documents do you need from me?

Initially, only a recent electricity bill. The net-metering and subsidy applications also require Aadhaar, proof of property ownership and the bank account to which the subsidy is to be credited. We confirm the exact list for your case before any application is filed.

Equipment

Which brands do you install?

We are a multi-brand company. Panels, inverters and batteries are selected to suit the roof, the budget and the compliance requirements of each project, and we quote on a customer's preferred brand where requested. See the brands we can source.

How many panels and how much roof will I need?

Divide the system size by the panel wattage. Most home panels in 2026 are rated about 540 to 600 watts, so a 5 kW system with 550 W panels needs 10 panels. Allow roughly 80 to 100 sq ft of shade-free roof for each kW. See how many panels your home needs.

What are DCR and non-DCR panels?

A DCR (Domestic Content Requirement) panel is made in India with solar cells also made in India. The PM Surya Ghar subsidy requires DCR panels. Non-DCR panels use imported cells and cost less, but a home that uses them gives up the subsidy. Which works out cheaper depends on the system size. See DCR or non-DCR panels.

Do solar panels work at night, on cloudy days or in the monsoon?

Not at night: you use grid power then, and the units your panels exported during the day are set against it on your bill. On cloudy and monsoon days the panels still work, but make less, which is why yearly output, not one day, is what matters. An on-grid system also switches off during a power cut, for the safety of linemen. See solar with battery backup if cuts are a concern.

Can I connect solar to my existing home inverter?

Sometimes, but the simplest choice for most homes is to keep both side by side: an on-grid solar system at the main supply to cut the bill, and the existing inverter and batteries as they are for backup. See connecting solar to an existing inverter for the other options.

Do I need a battery?

Only where power cuts are a significant concern. An on-grid system is cheaper and saves more, but it switches off when the grid goes down. A hybrid system with a battery keeps your essentials running, at a higher cost. Where an existing home inverter copes adequately, a solar battery may not be required. More on battery backup.

How long do solar panels last?

Most panels carry a performance warranty of 25 years or more. Their output falls slowly, by a small fraction each year, and they don't stop suddenly. The inverter is the part more likely to need repair or replacement during that time.

Installation and service

How long does installation take?

On a typical house the work on the roof takes a few days once the material arrives. The approvals, the net meter and the subsidy take longer, and that part runs on the department's timelines. Your proposal includes an expected timeline.

What happens at the site survey?

We check the shade-free roof area, shadows through the day, the structure your roof needs, the meter and your wiring, and go through your bills with you. The survey is free, and you commit to nothing before it. Your written proposal follows, sized from your bills and the roof.

How should I clean my solar panels?

With plain water and a soft brush, early in the morning or in the evening when the glass is cool. No detergents, soap or chemicals, which can damage the coating on the glass. In Tricity, clean every two to four weeks from October to February, when smog and dust settle, and before summer. See cleaning panels in dust and smog.

Will the installation damage my roof or cause leaks?

No. The structure stands on concrete footings on top of the roof slab, and any point where the roof surface is disturbed is sealed. The condition of the roof is recorded with the customer at the survey, before work begins.

Who do I call for service or a warranty claim?

Maya Green Power. We remain your point of contact after handover. Our own team handles any workmanship repair, and we take product warranty claims to the manufacturer. The handover documentation includes serial numbers, warranty cards, test readings and photographs.

Who will my contract and invoice be with?

With Maya Green Power. Your proposal states our details before you commit. For subsidy projects, the contract is with the registered vendor named on your application. We manage the project with you from the first bill review to handover, and remain your contact for service afterwards.

Which areas do you cover?

Mohali (including Aerocity and IT City), Zirakpur, Kharar and New Chandigarh for all projects. In Chandigarh and Panchkula we undertake commercial rooftops, hybrid systems and larger homes that don't need the subsidy.

Book a free site survey

Leave your name, number and area. What happens next:

  1. We call or WhatsApp you, normally within one working day, with an indicative system size and saving. If solar is not worth it for you, we say so.
  2. We survey your roof for free: the area, shading, the structure it needs, the meter and the wiring. You commit to nothing before this visit.
  3. You get a written proposal: the system size, every component by make and model, the warranties, the timeline and a savings range.

Prefer to send your bill directly?

Monday to Saturday, 10 am to 7 pm. We speak Hindi, Punjabi and English.

Your details

We call or WhatsApp you, normally within one working day.

The enquiry and the site survey are free. We never charge a fee to take your details.