Home / Subsidy

PM Surya Ghar subsidy for home solar in Mohali and Punjab

The PM Surya Ghar Muft Bijli Yojana provides central financial assistance of up to ₹78,000 for residential rooftop solar. Claiming it involves a portal application, a feasibility check by your electricity board (PSPCL in Punjab), an inspection and a net meter, completed in sequence. We confirm your eligibility before any commitment is made and manage each step until the subsidy is credited to your bank account.

We help eligible homeowners with the solar subsidy in Punjab, from planning a suitable rooftop system to preparing for the PM Surya Ghar application and the PSPCL net-metering steps. Approval rests with the scheme and PSPCL. For a step-by-step explanation of how to get the solar subsidy, read our Punjab solar subsidy application guide.

How much is the subsidy?

The central government pays ₹30,000 for each of the first 2 kW and ₹18,000 for the third. Nothing is added after 3 kW, so a 5 kW system gets the same ₹78,000 as a 3 kW one.

Two points are important for budgeting. The subsidy is credited to your bank account after the system is commissioned and the net meter is installed, so the full project cost is payable first. It is also a fixed amount and does not increase with the price of the equipment selected.

These are the amounts published for the scheme at the time of writing. They can change, so check the official portal before you apply.

System sizeSubsidy
1 kW₹30,000
2 kW₹60,000
3 kW or more₹78,000

When the subsidy is worth taking

The subsidy is paid only on systems built with DCR panels, which are made with Indian solar cells. These cost more than other panels: in October 2026 the difference is about ₹9,000 for every kW installed. The subsidy stops growing at 3 kW, but the extra cost of DCR panels keeps growing with every kW.

System sizeExtra cost of DCR panelsSubsidyCheaper route
3 kW₹27,000₹78,000DCR with the subsidy, about ₹51,000 better
5 kW₹45,000₹78,000DCR with the subsidy, about ₹33,000 better
8 kW₹72,000₹78,000About the same (DCR ₹6,000 better)
10 kW₹90,000₹78,000Non-DCR without the subsidy, about ₹12,000 better

Up to about 8 kW, DCR panels with the subsidy cost less overall, so take the subsidy. From about 9 kW, the extra panel cost is larger than the subsidy, so a home can pay less by giving up the subsidy and using non-DCR panels. This is the "Give It Up" option on the national portal, and homes can choose it until 31 March 2027. After that date, rooftop systems are due to need Indian cells in any case, so this saving is expected to disappear.

Our savings tool and calculator choose the cheaper route for the size they suggest, and your proposal shows both prices where the choice is close.

Based on MNRE's panel rules of May and June 2026 and market prices checked on 12 October 2026. Rules and prices change, so we confirm them for each project.

Who can get it

  • You own the house and have a roof to put panels on. The scheme is for homes. Shops, offices and factories are not covered.
  • You have a domestic electricity connection in your name, such as a PSPCL connection in Punjab. If the connection is in the name of a parent or previous owner, it should be transferred first. Name mismatches are a common cause of delay.
  • You haven't taken a solar subsidy before on the same connection.
  • The system is grid-connected and uses approved equipment. That means Indian-made panels that meet the scheme's rules, often called DCR panels, and an approved inverter.
  • It is installed through a vendor registered on the national portal.

Share your electricity bill and we will confirm your eligibility. Where the subsidy does not apply, we present the financial case for solar without it, so that you can compare both positions.

Check if I'm eligible

The process, from application to disbursement

  1. Register

    You register on the national portal with your electricity consumer number (your PSPCL account number in Punjab) and mobile number.

  2. Apply

    The rooftop solar application goes in, and the electricity board checks that your connection can take the system.

  3. Install

    Once the electricity board approves, the system is installed through a registered vendor with approved equipment.

  4. Net meter

    The electricity board inspects the installation and fits the net meter.

  5. Subsidy

    After the commissioning report, you enter your bank details on the portal and the subsidy is paid into your account.

Subsidy paid into your bank account

₹78,000

for a system of 3 kW or more

This follows the process described on the national portal. Steps and documents can change, so we confirm them for your case.

Our role and your documents

  • Eligibility and sanctioned-load check before any payment
  • Preparation of the portal application and the feasibility request to the electricity board
  • Follow-up on the inspection and net-meter installation
  • Commissioning documents required for the subsidy claim

We require a recent electricity bill, your Aadhaar and the bank account to which the subsidy should be credited. The portal sends OTPs to your registered mobile number, so you will need to be available to confirm them.

pmsuryaghar.gov.in ↗

PM Surya Ghar and Punjab's 300 free units are two different things

The two are frequently confused. "Muft Bijli" in the name of the central scheme refers to the power generated by your own panels. The scheme provides a one-time subsidy on the system and does not provide free units from PSPCL.

The 300 free units a month come from the Punjab government and apply to every domestic PSPCL connection, with or without solar. A household can benefit from both. How the two interact is explained on the home solar page.

Financing: the PM Surya Ghar loan

Because the subsidy is credited after installation, some households choose to finance the project. Several public sector banks offer a PM Surya Ghar loan of up to ₹2 lakh without collateral for systems up to 3 kW, at an interest rate linked to the RBI's repo rate. You apply through the national portal or the Jan Samarth portal after registering.

Interest rate, documentation and approval are determined by the bank, and current terms should be confirmed with it. We provide the quotation and technical documents the bank requires.

Areas covered for subsidy projects

Mohali (including Aerocity and IT City), Zirakpur, Kharar and New Chandigarh. These are all supplied by PSPCL, the Punjab electricity board.

Coming soon Chandigarh and Panchkula. Each has its own electricity department and approval process, which we are in the process of setting up. Non-subsidy projects are already undertaken in both.

Our guides explain how rooftop solar, the subsidy and net metering work in Chandigarh and Panchkula.

Frequently asked questions

How long does the subsidy take to come?

The claim can only be made after the electricity board has fitted the net meter and the commissioning report is on the portal. After that, payment is usually a matter of weeks. The slow part is normally the inspection and the net meter, which run on the electricity board's timelines. We follow up throughout, although the timeline is set by the department.

Can I get the subsidy on a 5 kW or 10 kW system?

Yes. The subsidy is calculated on the first 3 kW only, so you receive ₹78,000 whether the system is 3 kW or 10 kW. Your sanctioned load also has to be high enough for the size you want. On a system of about 9 kW or more, though, the extra cost of the DCR panels the subsidy requires is larger than the subsidy, so going without it can cost less. See when the subsidy is worth taking.

Is there a subsidy for shops, clinics or offices?

No. PM Surya Ghar is for homes on a domestic connection. A business saves through lower day-time bills and tax depreciation. See commercial rooftop solar.

Do I have to go through a registered vendor?

Yes. The subsidy is only paid for systems installed through a vendor registered on the national portal. Subsidy projects are executed through a registered vendor, whose name appears on the application. Maya Green Power remains your point of contact throughout.

Do subsidy panels cost more?

Yes. The scheme requires DCR panels, made with Indian cells, and in October 2026 they cost about ₹9,000 more per kW installed than other panels. Up to about 8 kW the subsidy more than covers this. Your proposal shows the price net of subsidy, to allow a like-for-like comparison.

Book a free site survey

Leave your name, number and area. What happens next:

  1. We call or WhatsApp you, normally within one working day, with an indicative system size and saving. If solar is not worth it for you, we say so.
  2. We survey your roof for free: the area, shading, the structure it needs, the meter and the wiring. You commit to nothing before this visit.
  3. You get a written proposal: the system size, every component by make and model, the warranties, the timeline and a savings range.

Prefer to send your bill directly?

Monday to Saturday, 10 am to 7 pm. We speak Hindi, Punjabi and English.

Your details

We call or WhatsApp you, normally within one working day.

The enquiry and the site survey are free. We never charge a fee to take your details.