<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Maya Green Power: rooftop solar guides</title>
    <link>https://www.mayagreenpower.com/blog</link>
    <description>Rooftop solar articles for homes and businesses in Mohali, Zirakpur and Tricity.</description>
    <language>en-in</language>
    <item>
      <title>How much does a 3 kW solar system cost in Mohali in 2026?</title>
      <link>https://www.mayagreenpower.com/blog/3-kw-solar-system-cost-mohali</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/3-kw-solar-system-cost-mohali</guid>
      <pubDate>Tue, 20 Oct 2026 00:00:00 GMT</pubDate>
      <description>The 2026 price of a 3 kW rooftop solar system in Mohali before and after the ₹78,000 subsidy, which homes it suits, and what it saves on a PSPCL bill.</description>
    </item>
    <item>
      <title>Rooftop solar in Chandigarh: CPDL net metering and what is different</title>
      <link>https://www.mayagreenpower.com/blog/rooftop-solar-chandigarh-cpdl</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/rooftop-solar-chandigarh-cpdl</guid>
      <pubDate>Tue, 20 Oct 2026 00:00:00 GMT</pubDate>
      <description>How rooftop solar works in Chandigarh in 2026: CPDL and JERC net metering, slab tariffs with no free units, the subsidy, and the city's 500 sq yd rule.</description>
    </item>
    <item>
      <title>Rooftop solar in Panchkula: UHBVN net metering explained</title>
      <link>https://www.mayagreenpower.com/blog/rooftop-solar-panchkula-uhbvn</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/rooftop-solar-panchkula-uhbvn</guid>
      <pubDate>Tue, 20 Oct 2026 00:00:00 GMT</pubDate>
      <description>How rooftop solar works in Panchkula in 2026: UHBVN tariffs, HERC net metering, PM Surya Ghar, Haryana's SUPY help, and what solar saves.</description>
    </item>
    <item>
      <title>Solar for small factories in Mohali's Industrial Area</title>
      <link>https://www.mayagreenpower.com/blog/solar-small-factories-mohali-industrial-area</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-small-factories-mohali-industrial-area</guid>
      <pubDate>Tue, 20 Oct 2026 00:00:00 GMT</pubDate>
      <description>What rooftop solar saves a small or medium factory on PSPCL's 2026-27 industrial tariff, how time-of-day billing affects it, sizing, shed roofs and payback.</description>
    </item>
    <item>
      <title>Protecting rooftop solar in storms and the monsoon</title>
      <link>https://www.mayagreenpower.com/blog/protect-rooftop-solar-monsoon-storms</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/protect-rooftop-solar-monsoon-storms</guid>
      <pubDate>Mon, 19 Oct 2026 00:00:00 GMT</pubDate>
      <description>Preparing rooftop solar in Tricity for pre-monsoon storms, lightning and heavy rain, what to check after a storm, and how output changes in the monsoon.</description>
    </item>
    <item>
      <title>Reading your solar inverter app: what the numbers mean</title>
      <link>https://www.mayagreenpower.com/blog/reading-your-solar-inverter-app</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/reading-your-solar-inverter-app</guid>
      <pubDate>Mon, 19 Oct 2026 00:00:00 GMT</pubDate>
      <description>What the figures in a solar inverter app mean, what a normal day looks like for a Tricity system, and the readings that mean you should call your installer.</description>
    </item>
    <item>
      <title>Solar for hotels, restaurants and banquet halls in Zirakpur</title>
      <link>https://www.mayagreenpower.com/blog/solar-hotels-restaurants-banquet-halls-zirakpur</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-hotels-restaurants-banquet-halls-zirakpur</guid>
      <pubDate>Mon, 19 Oct 2026 00:00:00 GMT</pubDate>
      <description>What rooftop solar saves for hotels, restaurants and banquet halls on PSPCL's 2026-27 tariff, how time-of-day billing affects evening use, and how to size it.</description>
    </item>
    <item>
      <title>Choosing a solar inverter: type, size and certification</title>
      <link>https://www.mayagreenpower.com/blog/choosing-a-solar-inverter</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/choosing-a-solar-inverter</guid>
      <pubDate>Sun, 18 Oct 2026 00:00:00 GMT</pubDate>
      <description>How to choose a rooftop solar inverter in Tricity: on-grid or hybrid, sizing against the panels, BIS standards, efficiency, warranty and where to mount it.</description>
    </item>
    <item>
      <title>Rooftop solar for schools and coaching centres in Tricity</title>
      <link>https://www.mayagreenpower.com/blog/rooftop-solar-schools-coaching-centres</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/rooftop-solar-schools-coaching-centres</guid>
      <pubDate>Sun, 18 Oct 2026 00:00:00 GMT</pubDate>
      <description>Why schools and coaching centres suit rooftop solar, the PSPCL, CPDL and UHBVN tariffs they pay in 2026-27, what holidays mean for savings, and typical payback.</description>
    </item>
    <item>
      <title>How much does solar produce in each month in Tricity?</title>
      <link>https://www.mayagreenpower.com/blog/solar-output-each-month-tricity</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-output-each-month-tricity</guid>
      <pubDate>Sun, 18 Oct 2026 00:00:00 GMT</pubDate>
      <description>Month-by-month solar output per kW in Mohali, Zirakpur and Chandigarh, why winter and the monsoon dip, and how net metering carries spring surplus into summer.</description>
    </item>
    <item>
      <title>Why is my solar producing less? Common causes and fixes</title>
      <link>https://www.mayagreenpower.com/blog/why-is-my-solar-producing-less</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/why-is-my-solar-producing-less</guid>
      <pubDate>Sun, 18 Oct 2026 00:00:00 GMT</pubDate>
      <description>Normal monthly solar output in Tricity, and the common reasons a rooftop system makes less: season, dirt, shade, grid voltage and faults, and what to check.</description>
    </item>
    <item>
      <title>Questions to ask at a solar site survey</title>
      <link>https://www.mayagreenpower.com/blog/questions-to-ask-at-solar-site-survey</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/questions-to-ask-at-solar-site-survey</guid>
      <pubDate>Sat, 17 Oct 2026 00:00:00 GMT</pubDate>
      <description>What a proper rooftop solar survey in Tricity should check, the questions to ask the surveyor on your roof, and what to have ready before they arrive.</description>
    </item>
    <item>
      <title>Solar for kothis with three or more ACs: sizing and cost</title>
      <link>https://www.mayagreenpower.com/blog/solar-for-kothis-three-or-more-acs</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-for-kothis-three-or-more-acs</guid>
      <pubDate>Sat, 17 Oct 2026 00:00:00 GMT</pubDate>
      <description>Sizing rooftop solar for a large Mohali or Zirakpur kothi with three or more ACs: summer units, 8 to 13 kW systems, cost, the subsidy question and roof space.</description>
    </item>
    <item>
      <title>Solar panel maintenance through the year in Tricity</title>
      <link>https://www.mayagreenpower.com/blog/solar-maintenance-through-the-year</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-maintenance-through-the-year</guid>
      <pubDate>Sat, 17 Oct 2026 00:00:00 GMT</pubDate>
      <description>A season-by-season maintenance plan for rooftop solar in Mohali and Chandigarh: what to do in smog, dust storms and the monsoon, and what to leave alone.</description>
    </item>
    <item>
      <title>Charging an electric car or scooter with rooftop solar</title>
      <link>https://www.mayagreenpower.com/blog/charge-electric-car-with-rooftop-solar</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/charge-electric-car-with-rooftop-solar</guid>
      <pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate>
      <description>How many units an electric car or scooter uses, how much rooftop solar covers it, planning for a future EV, the charger and Punjab's free units.</description>
    </item>
    <item>
      <title>Can I connect rooftop solar to my existing home inverter?</title>
      <link>https://www.mayagreenpower.com/blog/connect-solar-to-existing-home-inverter</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/connect-solar-to-existing-home-inverter</guid>
      <pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate>
      <description>Three ways to combine rooftop solar with the inverter and batteries you already have in Tricity, what each does in a power cut, and which keeps the subsidy.</description>
    </item>
    <item>
      <title>How long will a solar battery last in a power cut?</title>
      <link>https://www.mayagreenpower.com/blog/how-long-solar-battery-lasts-power-cut</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/how-long-solar-battery-lasts-power-cut</guid>
      <pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate>
      <description>How many hours a solar battery runs your home in a power cut, with typical loads, a table of battery sizes, and why daytime cuts are different with solar.</description>
    </item>
    <item>
      <title>Solar backup for home offices and online classes</title>
      <link>https://www.mayagreenpower.com/blog/solar-backup-home-office-online-classes</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-backup-home-office-online-classes</guid>
      <pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate>
      <description>How much battery a home office or a child's online class needs in Tricity's power cuts, what to put on backup, and when a hybrid solar system is worth it.</description>
    </item>
    <item>
      <title>DCR or non-DCR solar panels: which should you buy in 2026?</title>
      <link>https://www.mayagreenpower.com/blog/dcr-or-non-dcr-solar-panels</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/dcr-or-non-dcr-solar-panels</guid>
      <pubDate>Thu, 15 Oct 2026 00:00:00 GMT</pubDate>
      <description>What DCR and non-DCR solar panels are, why the subsidy needs DCR, the 2026 Indian-cell rules for homes and businesses, and when skipping the subsidy costs less.</description>
    </item>
    <item>
      <title>Lithium or tubular battery for solar: a 10-year cost comparison</title>
      <link>https://www.mayagreenpower.com/blog/lithium-or-tubular-solar-battery</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/lithium-or-tubular-solar-battery</guid>
      <pubDate>Thu, 15 Oct 2026 00:00:00 GMT</pubDate>
      <description>Lithium (LFP) and tubular batteries compared for home solar backup in Tricity: usable energy, life, upkeep and a 10-year cost example, and why LFP suits homes.</description>
    </item>
    <item>
      <title>Upfront payment or EMI: which works better for rooftop solar?</title>
      <link>https://www.mayagreenpower.com/blog/upfront-or-emi-rooftop-solar</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/upfront-or-emi-rooftop-solar</guid>
      <pubDate>Thu, 15 Oct 2026 00:00:00 GMT</pubDate>
      <description>Paying upfront, a PM Surya Ghar bank loan or vendor finance for rooftop solar: what each really costs, why a low EMI can hide a bad deal, and how to decide.</description>
    </item>
    <item>
      <title>Raised, low or canopy: which solar structure suits your roof?</title>
      <link>https://www.mayagreenpower.com/blog/raised-low-or-canopy-solar-structure</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/raised-low-or-canopy-solar-structure</guid>
      <pubDate>Wed, 14 Oct 2026 00:00:00 GMT</pubDate>
      <description>The three ways to mount rooftop solar on a Tricity house, a low frame, a raised frame or a canopy, and what each means for roof space, cost, wind and leaks.</description>
    </item>
    <item>
      <title>Solar warranties explained: panels, inverter and workmanship</title>
      <link>https://www.mayagreenpower.com/blog/solar-warranties-explained</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-warranties-explained</guid>
      <pubDate>Wed, 14 Oct 2026 00:00:00 GMT</pubDate>
      <description>The warranties behind a rooftop solar system, how long each runs, what none of them cover, the five-year PM Surya Ghar system warranty, and how to make a claim.</description>
    </item>
    <item>
      <title>How to buy rooftop solar for your home in Tricity, step by step</title>
      <link>https://www.mayagreenpower.com/blog/how-to-buy-rooftop-solar-tricity</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/how-to-buy-rooftop-solar-tricity</guid>
      <pubDate>Tue, 13 Oct 2026 00:00:00 GMT</pubDate>
      <description>The whole process of buying rooftop solar for a home in Mohali, Zirakpur or Chandigarh, from reading your bill to the net meter, and what to check at each step.</description>
    </item>
    <item>
      <title>Solar on a rented house or a floor you do not own</title>
      <link>https://www.mayagreenpower.com/blog/solar-on-rented-house-or-builder-floor</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-on-rented-house-or-builder-floor</guid>
      <pubDate>Tue, 13 Oct 2026 00:00:00 GMT</pubDate>
      <description>Can tenants and builder-floor owners in Tricity install rooftop solar? Who can claim the subsidy, whose permission you need, and the shared-plant option.</description>
    </item>
    <item>
      <title>TOPCon, mono PERC or bifacial: which solar panel to choose in 2026?</title>
      <link>https://www.mayagreenpower.com/blog/topcon-mono-perc-bifacial-solar-panels</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/topcon-mono-perc-bifacial-solar-panels</guid>
      <pubDate>Tue, 13 Oct 2026 00:00:00 GMT</pubDate>
      <description>How TOPCon, mono PERC and bifacial panels differ in efficiency, heat and ageing, what that means on a hot Tricity roof, and how to choose for a subsidy home.</description>
    </item>
    <item>
      <title>How many solar panels does my home need? A guide for Tricity</title>
      <link>https://www.mayagreenpower.com/blog/how-many-solar-panels-for-my-home</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/how-many-solar-panels-for-my-home</guid>
      <pubDate>Mon, 12 Oct 2026 00:00:00 GMT</pubDate>
      <description>Work out the number of solar panels from system size and panel wattage, the roof space they take, and typical panel counts for 2, 3 and 4 BHK homes in Tricity.</description>
    </item>
    <item>
      <title>Parts of a rooftop solar system and what to check in each</title>
      <link>https://www.mayagreenpower.com/blog/parts-of-rooftop-solar-system</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/parts-of-rooftop-solar-system</guid>
      <pubDate>Mon, 12 Oct 2026 00:00:00 GMT</pubDate>
      <description>What each part of a rooftop solar system does, from the panels and inverter to the cables, earthing and net meter, and what to check for each one in a quote.</description>
    </item>
    <item>
      <title>Solar for housing societies in Punjab: common areas and shared plants</title>
      <link>https://www.mayagreenpower.com/blog/solar-for-housing-societies-punjab</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-for-housing-societies-punjab</guid>
      <pubDate>Mon, 12 Oct 2026 00:00:00 GMT</pubDate>
      <description>How flats and societies in Mohali and Zirakpur can use rooftop solar: common-area systems, PSERC's virtual net metering from July 2026, and the society subsidy.</description>
    </item>
    <item>
      <title>How to increase your sanctioned load with PSPCL before going solar</title>
      <link>https://www.mayagreenpower.com/blog/increase-sanctioned-load-pspcl-before-solar</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/increase-sanctioned-load-pspcl-before-solar</guid>
      <pubDate>Sun, 11 Oct 2026 00:00:00 GMT</pubDate>
      <description>Why your sanctioned load limits the size of a solar system in Punjab, when PSPCL raises it with the solar application, the documents, charges and time limits.</description>
    </item>
    <item>
      <title>Solar for one or two ACs: can 3 kW or 5 kW run a 1.5-ton AC?</title>
      <link>https://www.mayagreenpower.com/blog/solar-for-one-or-two-acs</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-for-one-or-two-acs</guid>
      <pubDate>Sun, 11 Oct 2026 00:00:00 GMT</pubDate>
      <description>How many units a 1.5-ton AC uses in a Tricity summer, what 3 kW and 5 kW systems make, and how to size solar for one or two ACs under Punjab's free units.</description>
    </item>
    <item>
      <title>Solar loans in 2026: PM Surya Ghar bank loans and EMIs explained</title>
      <link>https://www.mayagreenpower.com/blog/solar-loans-pm-surya-ghar-2026</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-loans-pm-surya-ghar-2026</guid>
      <pubDate>Sun, 11 Oct 2026 00:00:00 GMT</pubDate>
      <description>How PM Surya Ghar rooftop solar loans work in 2026: rates, limits, the documents banks ask for, an EMI example for a 3 kW home, and using the subsidy to prepay.</description>
    </item>
    <item>
      <title>Documents for PSPCL net metering: the complete list for 2026</title>
      <link>https://www.mayagreenpower.com/blog/pspcl-net-metering-documents</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/pspcl-net-metering-documents</guid>
      <pubDate>Sat, 10 Oct 2026 00:00:00 GMT</pubDate>
      <description>Every document PSPCL asks for when a home or shop in Punjab goes solar: what you provide, what your installer uploads, and the time limits at each stage.</description>
    </item>
    <item>
      <title>Solar panel tilt angle and direction for Mohali and Chandigarh</title>
      <link>https://www.mayagreenpower.com/blog/solar-panel-tilt-angle-direction-mohali</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-panel-tilt-angle-direction-mohali</guid>
      <pubDate>Sat, 10 Oct 2026 00:00:00 GMT</pubDate>
      <description>The best tilt and direction for rooftop solar at Tricity's latitude, what a flat or east-facing array loses, and why roof space often decides the angle.</description>
    </item>
    <item>
      <title>How to clean solar panels in Tricity's dust and smog</title>
      <link>https://www.mayagreenpower.com/blog/clean-solar-panels-dust-smog</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/clean-solar-panels-dust-smog</guid>
      <pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate>
      <description>Dust and smog can cut rooftop solar output in north India by a fifth or more. When to clean your panels, the safe way to do it, and the mistakes to avoid.</description>
    </item>
    <item>
      <title>How to compare solar quotations without being misled</title>
      <link>https://www.mayagreenpower.com/blog/compare-solar-quotations</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/compare-solar-quotations</guid>
      <pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate>
      <description>Two solar quotes at the same price can be very different systems. The lines to check, the red flags in cheap quotes, and a worked comparison of two offers.</description>
    </item>
    <item>
      <title>On-grid or hybrid solar: which one suits your power cuts?</title>
      <link>https://www.mayagreenpower.com/blog/on-grid-vs-hybrid-solar-power-cuts</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/on-grid-vs-hybrid-solar-power-cuts</guid>
      <pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate>
      <description>Why on-grid solar switches off in a power cut, what a hybrid system with a battery costs in 2026, and how to decide which one your home or shop needs.</description>
    </item>
    <item>
      <title>PM Surya Ghar ends in March 2027: what it means for your solar plans</title>
      <link>https://www.mayagreenpower.com/blog/pm-surya-ghar-deadline-march-2027</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/pm-surya-ghar-deadline-march-2027</guid>
      <pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate>
      <description>The PM Surya Ghar subsidy rates are set only until 31 March 2027. What that means for homes in Punjab, how long the process takes, and when to start.</description>
    </item>
    <item>
      <title>Solar for shops and clinics in Zirakpur: savings and payback</title>
      <link>https://www.mayagreenpower.com/blog/solar-shops-clinics-zirakpur</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-shops-clinics-zirakpur</guid>
      <pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate>
      <description>What rooftop solar saves a shop, showroom or clinic in Zirakpur on PSPCL's 2026-27 business tariff, with worked examples, depreciation, roof rights and backup.</description>
    </item>
    <item>
      <title>What size solar system does my home need? Work it out from your bill</title>
      <link>https://www.mayagreenpower.com/blog/what-size-solar-system-for-my-home</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/what-size-solar-system-for-my-home</guid>
      <pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate>
      <description>A step-by-step way to size a rooftop solar system from your electricity bill, with Punjab's free units, roof space and sanctioned load taken into account.</description>
    </item>
    <item>
      <title>How much does a 5 kW solar system cost in Mohali in 2026?</title>
      <link>https://www.mayagreenpower.com/blog/5-kw-solar-system-cost-mohali</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/5-kw-solar-system-cost-mohali</guid>
      <pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate>
      <description>The 2026 price of a 5 kW rooftop solar system in Mohali, what drives it, the ₹78,000 subsidy, GST after the 2025 cut, and the saving on a PSPCL bill.</description>
    </item>
    <item>
      <title>Net metering in Punjab: how PSPCL bills export and import units</title>
      <link>https://www.mayagreenpower.com/blog/net-metering-punjab-pspcl-billing</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/net-metering-punjab-pspcl-billing</guid>
      <pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate>
      <description>How net metering works on a PSPCL bill in 2026: the two-way meter, export and import units, carry-forward, the settlement year, and the new rules for flats.</description>
    </item>
    <item>
      <title>PM Surya Ghar subsidy in Punjab: how to apply, step by step</title>
      <link>https://www.mayagreenpower.com/blog/pm-surya-ghar-subsidy-punjab-how-to-apply</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/pm-surya-ghar-subsidy-punjab-how-to-apply</guid>
      <pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate>
      <description>How homes in Mohali, Zirakpur and Kharar claim up to ₹78,000 under PM Surya Ghar in 2026: portal steps, documents, PSPCL approval and mistakes to avoid.</description>
    </item>
    <item>
      <title>Is rooftop solar worth it with Punjab's 300 free units?</title>
      <link>https://www.mayagreenpower.com/blog/solar-worth-it-punjab-300-free-units</link>
      <guid isPermaLink="true">https://www.mayagreenpower.com/blog/solar-worth-it-punjab-300-free-units</guid>
      <pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate>
      <description>Punjab homes get 300 free units a month. When rooftop solar still saves money, when it does not, and how to size a system around the free-unit limit.</description>
    </item>
  </channel>
</rss>
